Announced innovative dual-revenue financing scheme allowing it to take percentage cuts of AI cloud revenue alongside hardware sales; facing continued GPU smuggling enforcement issues.
Planning to rent out its AI compute capacity directly to developers, entering competition with AWS and major cloud providers.
Signed record 10.5 GW renewable energy deal with Brookfield; investing $1.7B in Indonesia for AI and cloud infrastructure.
Announcing $712.5B investment in South Korean operations including major NAND and DRAM expansions to compete in AI memory market.
Entering GPU rental market to monetize its 10 GW US server farm currently under construction.
The AI arms race obsession with models misses the core constraint: infrastructure. Power, cooling, and networking are the real bottlenecks holding back AI deployment.
AI workloads are starving for bandwidth as network switches fail to keep pace with compute. Expensive chips sit idle waiting for data connectivity.
About 25 data center projects consuming ~5 GW total are under engineering review in Commonwealth Edison's territory. Chicago's power grid faces unprecedented AI-driven strain.
Nvidia's new business model allows it to double-dip by collecting both chip sales revenue and a percentage of cloud service revenue generated from its GPUs.
Meta is weighing two service models for selling access to its AI infrastructure: hosted model endpoints or raw compute capacity, directly challenging AWS.
Singaporean authorities seized a $42M mansion and froze $772K from four individuals accused of smuggling Nvidia GPUs to China via Singapore transshipment.
Supermicro claims Taiwanese authorities were cooperatively given access to premises and employee workstations, not a raid. Company insists only individuals, not the institution, are under investigation.
Localities are increasing taxes and regulations on data centers as football-field-sized buildings face growing scrutiny over power, environmental, and land-use impacts.
Meta is weighing two service models for selling access to its AI infrastructure: hosted model endpoints or raw compute capacity, directly challenging AWS.
Microsoft commits $1.7B for AI and cloud infrastructure in Indonesia, plus training for 2.5 million people in Southeast Asia on AI skills, including 840,000 Indonesians.
Supermicro faces new legal troubles following founder's indictment for illegally exporting $2.5B in GPUs to China, signaling ongoing compliance issues.
UK's CMA is investigating Microsoft and Amazon's investments in AI startups (Anthropic, Mistral, Inflection), calling the inquiry 'unprecedented' in scope.
Valar Atomics publicly activated its Ward 250 microreactor, powering an RTX Spark PC. The startup is partnering with Nvidia on a 30MW AI factory using closed-loop nuclear power without local water usage.
Brookfield Renewable Partners will provide 10.5+ GW of renewable energy capacity across the US and Europe starting in 2026, supporting Microsoft's massive AI infrastructure buildout.
PUCT staff backs ERCOT's proposed operating conditions for colocated AI data center campuses behind existing power plants in Texas's novel infrastructure framework.
Roundup of latest data center announcements and projects from the past month reflects accelerating capacity expansion across North America and Europe.
Data4's new 'Mil02' campus in Milan represents €1B investment expected to complete by 2027, expanding Italian data center footprint and European AI capacity.
Virginia data centers processing 70% of global digital traffic are driving demand for coal power from neighboring states, resurrecting old generation capacity for AI loads.
Data Center World speakers shared insights on cooling innovations, AI's dual impact, emerging markets, and diversity challenges in the industry.
Survey of IT professionals reveals strategies for optimizing edge computing costs, security, and deployment as edge adoption accelerates.
Moving AI inference from demo to production-scale reveals hidden technical debt and infrastructure challenges. Real-world lessons from high-volume operations differ dramatically from benchmarks.
Nvidia introduces financing option that lets it collect revenue from both GPU sales and a cut of cloud service revenue generated using those chips.
SoftBank is monetizing its 10 GW US server farm under construction by entering the competitive GPU rental market for AI training workloads.
SK Hynix commits massive $712.5B to South Korea including new NAND fab in Cheongju and DRAM packaging facility to meet exploding AI memory demand.
SK Hynix is racing Samsung to expand HBM (high-bandwidth memory) production for Nvidia GPUs with a new $15B fab in Cheongju, South Korea.
Micron secures up to $13.6B in US government grants and loans, guaranteeing its first cutting-edge US manufacturing expansion in 20+ years.
Commerce Department to award Micron $6B+ in chip manufacturing grants as part of broader US effort to reshore semiconductor production alongside Intel and TSMC.
ASML plans to double capacity by 2030 after Dutch government commits $2.7B, anticipating surging semiconductor demand from generative AI boom.
Viewing AI processing as part of a project data pipeline enables enterprises to train models effectively and select storage fit for purpose.
Domain choice (.io, .ai, .co) is treated as design, but companies ignore that these fashionable TLDs tie them to geopolitical risks and the policies of their host nations.
CloudFest Americas is coming to Miami this November, bringing the sprawling European infrastructure festival to the Americas for the first time.